XLXD-02

Prefabricated Commissioning Solution with flushing bypass, linear dirt resistant PICV PEB92 1 ½”, Filterball shut off valve with integrated strainer, drain valve, air vent and additional test point.

The kit is ready to be install and provides all components required for commissioning and operation of the terminal unit (FCU - AHU). 100% factory tested against leakage. Fully maintainable PICV with test points for commissioning and system optimization.Filterball valve with blowout prof stem, triple sealing technology and adjustable packing gland. Stainless steel filter FM28. Very easy to inspect and maintain. Soft thermal insulation available, if included the product part number becomes XT1695G.